Co-op, Symmetry Park, Biggleswade

Design, construction and fit-out of a temperature controlled regional distribution centre

Tritax Symmetry, the dedicated logistics development company of Tritax Big Box REIT plc, appointed Winvic Construction Ltd as its main contractor for the Co-op’s new 661,000 sq ft regional distribution centre at Symmetry Park, Biggleswade.

At a glance

  • Client: Tritax Symmetry
  • Architect: AJA Architects
  • Engineer: Hydrock Consulting
  • Programme: 49 Weeks
  • Completion: February 2021
  • BREEAM: Excellent

Ratings of BREEAM ‘Excellent’ and EPC A, we started construction of the base build and fit out project in March 2020. Due to the layout of the building comprising ambient, chilled and frozen sections and the requirement for maintenance walkways and gantries over these zones, the most efficient design resulted in 18 separate portal steel frames. Furthermore, while earthworks continued around the building’s footprint, cranes and MEWPs were positioned inside the structure, which is not usual, and we changed the steel frame erection programme accordingly.

The scheme delivery also comprises an attached two-storey main office totalling 31,000 sq ft and vehicle maintenance building as well as civils and infrastructure works such as off-site service upgrades, incoming services, car parking and service yards.

Sustainability

The facility will be one of the greenest depots in the country, running on 100% renewable electricity and is the most sustainable building Tritax Symmetry has delivered to date.

  • BREEAM ‘Excellent’

  • Runs on 100% renewable electricity

  • 661,000 sq ft distribution centre