Winvic were contracted by Marks & Spencer to carry out the full fit-out of this warehouse.
At a glance
- Project value: £32.1m
- Client: Clowes Developments
- End-user: Marks & Spencer
- Architect: Ashton Smith Associates
- Engineer: BWB
- Programme: 81 weeks
- Completion: July 2013
- BREEAM: Excellent
Works included a five floor 800,000 sq ft mezzanine floor, 25m high automated crane and racking, plastic coping tote conveyor systems – dual floor, mini crane, hanging garment racking, 25m high VNA racking, suspended trapeze lighting, multi chamber – temperature controlled, air cargo docks, integrated lighting, sprinkler and fire alarm system, roof chambers and vertical and horizontal separation chambers.
-
800,000 sq ft mezzanine
-
25m high VNA racking
-
Temperature controlled multi chamber, air cargo docks